Date Calculator
Count the days, weeks and business days between two dates, or add and subtract days, weeks, months and years from any date.
Friday to Thursday
1 month and 11 days
- Total days
- 41
- end date not counted
- Weeks
- 5
- and 6 days
- Business days
- 29
- Monday to Friday
Business days count Monday to Friday and nothing else — public holidays differ by country and region, so none are taken off.
From Friday 20 November 2026 to Thursday 31 December 2026: 1 month and 11 days. 41 days in total, or 5 weeks and 6 days; 29 business days (Monday to Friday).
Table of contents
How to use the date calculator
- 1
Choose what to work out
"Between two dates" counts the span from one date to another. "Add or subtract" starts from a date and moves forwards or backwards by the amount you give it.
- 2
Enter the dates
Each date is a day, a month and a year in their own boxes. The difference opens on today to the end of this year, and adding opens on today plus 30 days, so there is an answer on screen before you type anything.
- 3
Set the options
Tick "Include the end date" when both days should count, as in "1 to 5 March is five days". When adding, tick "working days" to count Monday to Friday only.
Counting the days between two dates
The question "how many days between" has two honest answers, and most arguments about it are people giving different ones. Counting the steps from one date to the next — the gap — gives one less than counting the days themselves. From Monday to Friday is four steps and five days. This calculator gives the gap by default, because that is what "days until" and "days since" mean, and the "Include the end date" box switches to counting both ends. Both figures stay consistent with each other: the total, the weeks and the business days all move together.
Years, months and days are counted the calendar way. Whole months first, each ending on the same day of a later month, then the days left over — so 16 November to 25 December is 1 month and 9 days. Where a month has no matching day, it ends on its last day instead, which is why 31 January to 28 February counts as exactly one month in a common year.
Business days are Monday to Friday. That is the whole rule, stated rather than hidden: no bank holidays, no regional days off, no company shutdowns. For a notice period or a delivery estimate that crosses a public holiday, take it off the figure yourself — a calculator that guessed your country would get it wrong for most visitors.
Behind every figure is a whole day number for each date, worked out from the year, month and day with no clock involved. Two dates either side of the clocks changing are still the right number of days apart, which is not true of a calculator that subtracts timestamps and divides by 24 hours.
Adding and subtracting days, weeks and months
Days and weeks are exact. 90 days from today is 90 calendar days, and 6 weeks is 42. These are the figures behind deadlines, return windows, cooling-off periods and "due in 30 days" invoices.
Months and years follow the calendar. A month from 15 March is 15 April, whichever month is in between. When the day does not exist — a month after 31 March would be 31 April — the result is the last day of the month, 30 April. Adding a year to 29 February gives 28 February. Each amount is counted from the date you started on, so twelve months from the 31st is the 31st again, not a date that has slowly drifted down to the 28th.
Working days skip weekends. Tick the box and the days field counts Monday to Friday only, starting from the day after the start date. Ten working days from a Friday is the Friday a fortnight later. This is how most notice periods, response-time promises and delivery estimates are written.
Subtracting works the same way backwards — 90 days before a date, or 10 working days before a deadline to know when to start. If what you actually want is someone’s age on a date, the age calculator does that directly, with the next birthday thrown in.
Frequently asked questions
Enter both dates under "Between two dates" and read Total days. By default the count is the number of days you move forward to get from the first date to the second — Monday to Friday of the same week is 4 days. Tick "Include the end date" to count both ends, which gives 5. Which one you want depends on the question: a hotel stay counts nights and leaves the end out; a run of event days counts both.
Monday to Friday, and nothing else is taken off. Public holidays differ by country, by region and sometimes by employer, so any list built in would be wrong for most people. If your span crosses a bank holiday, subtract it yourself. The count follows the same rule as the total: the end date is only counted when you tick "Include the end date".
The last day of February — 28 February, or 29 in a leap year. When the day you start on does not exist in the month you land in, the date is clamped to that month's last day rather than spilling into the next. Adding two months to 31 January gives 31 March, because each step is counted from the original date and not from the clamped one.
Largest first: years and months together, then weeks, then days. The order changes some answers — in 2023, 30 January plus one month is 28 February, and one day more is 1 March; adding the day first would have reached 31 January, and the month then 28 February. Largest first is what people mean by "a month and a day from now".
Each working day is a step to the next Monday-to-Friday date, and the start date itself is never counted — the same rule as the WORKDAY function in spreadsheets. So 1 working day after a Friday is the Monday, and 5 working days after a Monday is the Monday after. Years, months and weeks are still calendar amounts; only the days field switches to working days.
The calculator swaps them and tells you, rather than showing negative numbers. A span is the same length in either direction; it says plainly when it has counted from the second date.
No. Every date is a plain year, month and day turned into a whole day number, so there is no time of day for a clock change to shorten and no midnight in another zone for a date to slip across. A span that includes the night the clocks go forward is still the right number of days.
Yes. GET /api/v1/age?from=2026-11-16&to=2026-12-25 returns the same difference as JSON, including business days; add includeEnd=true to count both ends. The MCP server offers it through the calculate_age tool with the same from and to arguments.
The Zeal Promise
Non-negotiable, on every tool we ship.
- No sign-up — ever
- No watermarks on any output
- No ads near the download button
- Works fully on mobile
- Privacy-first: processing stays in your browser
- Open source (MIT) — audit it, contribute, self-host
- Zero runtime dependencies in tool logic